| Month 0–1 |
Partner identification & outreach |
Identify 2–3 regional exploration or government bodies (state survey, mining company, university core library) that hold rich datasets (core scans, geophysics, geology, drilling, assays). Initiate Memoranda of Understanding (MOUs) or data access agreements. Prepare and submit exploration permit / regulatory documentation (PEPR or equivalent). |
| Month 2 |
Data audit & ingestion |
Receive initial datasets. Run an audit/diagnostics pass: assess data quality, gaps, mismatches. Build ingestion pipelines to normalize formats, metadata alignment, flag critical inconsistencies. |
| Month 3 |
Baseline model + proof of concept |
Use partner data to begin a Deposit Characterization study from regional to district scale in the Delamerian Region. We will apply AI/ML algorithms (such as unsupervised clustering) to examine how each deposit correlates with its geological setting and produce target maps / prospectivity zones. This enhanced study is contingent on access to rich datasets, concluding with a presentation of results with maps, confidence overlays, and commentary to the partner. |
| Month 4 |
Feedback iteration & refinement |
Work with partner geoscientists to review outputs; incorporate their feedback (structural corrections, known pins) and refine cleaning/curation + model fine-tuning. |
| Month 5-6 |
Prioritize drillable targets & due diligence |
From refined prospectivity maps, select 1–3 high-priority targets. Conduct desktop due diligence (review access, terrain, logistics, permitting). Begin environmental and heritage baseline studies (flora, fauna, hydrology). |
| Month 7–8 |
Small surface validation (if permitted) |
Conduct low-impact geochemical sampling, ground geophysics (magnetics, IP, resistivity) over target areas to validate anomalies. |
| Month 9 |
First scout drill design & budgeting |
Design a small scout drill program (1–2 holes) over the top target(s). Finalize budget, logistics, contractor selection. |
| Month 10–11 |
Drill contractor engagement & mobilization |
Secure drilling contractor, site access, supplies, site preparation. Mobilize to site. |
| Month 12 |
Begin drilling & first assays |
Drill first holes, retrieve core, submit samples, generate core logs + spectral scans. Begin combining real assay + core data back into your model pipeline for feedback + refinement. |